Our Clients

Mount Isa City Council
Jack up building with hydraulic synchronous lifting jack system and jacking towers and remove old stumps, install new fascia, gutters, downpipes and paint, construct new concrete slab, install new tim...
Kennedy Energy Project Hughenden
Auzscot Constructions proudly supported the Kennedy Energy Project in Hughenden. This project was led by Quanta Solar Australia and Vestas. It began construction in 2017 and was operational by late 20...
Mount Isa Mining Projects
Auzscot Constructions are based in Cloncurry and have developed a strong working relationship with the Mount Isa Mines contractors and vendors. The Mount Isa Mines have been operational since the 1920...

Our Clients

Auzscot can offer hire solutions to make your next job more productive, and help you to transport it to your job site. Our commitment to investing in our team means we can offer skilled operators ready to expertly operate your equipment.


Projects

Auzscot can offer hire solutions to make your next job more productive, and help you to transport it to your job site. Our commitment to investing in our team means we can offer skilled operators ready to expertly operate your equipment.

Ernest Henry Mine

Sewage Treatment Plant Upgrade, Fuel Farm Upgrade, Various building and construction works at Ernest Henry Mine Accommodation Village, High Voltage Crib Room refurbishment, Magnetite Shed Concrete Slab and Pallet Racking, construction of Verti Mill Bund, construction of 4100 laydown shed, Ernest Henry Mine Stores draining upgrade, concrete anchor blocks, repairs to Ernest Henry House 2 Absolon Street, construction of concentrator loan out slab, construction of Absolon Street Fence, install grouting around stock tank bases, shed footings, construction of weighbridge, concrete anchor blocks, extension to light vehicle washbay, installation of gabion wall, various earthworks, construction of stormwater, general concreting works, labour hire, plant hire, vacuum and transport of regulated waste (sewage).


Cloncurry Shire Council

Construction of Chinaman Creek Dam Recreation Area, Constructions of large footpath to Chinaman Creek Dam, Construction of Sheaffe Street stormwater upgrade and water main upgrade, Cloncurry Weir, construction of Fishway Ladder at Cloncurry Weir, various remote floodway constructions and floodway repairs, design and construction of luxury 4 bedroom residence on Henry Street, refurbishment of Recreation Grounds Kiosk Building, construction of Cloncurry 150 years pathway, Curry Kids Child Care Centre landscaping works, repairs to Chinaman Dam, repairs to Water Treatment Plant, construction of Water Main and Sewer Main at Airport, construction of kerbing at Industrial Area, construction of Ramsay Street Carpark, installation of cattle grids, construction of Sale Yard Slabs, construction of Ramsay Street Footpaths, leak repairs, Cloncurry Airport Drainage, installation of grids and headwalls, construction of gabion baskets, installation of Chute Footings, works department toilet refurbishment, construction of Cloncurry Pool disabled ramp, John Flynn Place patch up works, various other building and construction works, plant hire, labour hire, vacuum excavations and transport of regulated waste.


RoadTek

Concrete inspection repairs, road sign installations, culvert repairs, creek reinstatements, bridge maintenance, concrete rehabilitation, headwall and culvert construction, plant hire, labour hire, vacuum excavations, various earthworks.


Ergon Energy

Construction of 132kv switchyard including structural footings, construction of Cloncurry Substation, Cloncurry isolator footings construction, New Century Mine construction of structural footings in switch yard.


Department of Transport and Main Roads

Principal contractor for Townsville Ring Road Stage 4 Pipeline Relocations – 1.5km of DN800 sintikote DICL Water Main, several live hook ups to existing bulk and reticulation water infrastructure, construction of valve pits and PRV compounds, trenchless construction coordination, asbestos removal.


Economic Development Queensland

Pup watermain reconstruction for Oonoomba Village Water Main, construction of 2 ageing in place residences in Cloncurry.


Queensland Health

Refurbishment of Camooweal Health Care Clinic – demolish access ramp, dig footings, install new ramp, repairs to inside and outside of building, dig footings and install new ramp, repairs to outside of buildings, repairs to window frames, external paint works, soffits, demolition to bathrooms, install plumbing, reline bathrooms, install door hardware, painting inside buildings, joinery and flooring.


McKinlay Shire Council

Refurbishment of amenities building, design and construction of Julia Creek Outdoor SPA Baths, construction of Dirt and Dust shed, construction of 4 residential houses for McKinlay Shire Council in Julia Creek.


Boulia Shire Council

Various flood damage works, bridge renewal program, construction of swimming pool shade structures, construction of new depot office.


Flinders Shire Council

Construction of fluoridation building and equipment including construction of foundations, floor slab, masonry block building, roof, driveway and unloading bund. Construction of raw water pipelines, connection to existing systems, thrust block constructions, valves and fittings. Control room fit out, construction of ventilation system including pipe work and water trap.


Townsville City Council

Construction of Magnetic Island Delivery Mains, Fulham Road DN375 Water Main Replacement, Upgrade of Hindley Street Pump Station, Kirwin Main Drain Redirections, Bayswater Trunk Sewer Main, Townsville West Trunk Sewer Main Diversion, Bohle Plains Water Supply, North shore Boulevard Water Trunk Mains.


Mount Isa Water Board

Deep well Pump Station Upgrade – steel pipe replacement, mechanical fittings, concrete works, earthworks, internal pipe work repairs, CCTV operation. Emergency Filtration Units, poly pipe installations – poly welding of pipes and fabrication of fittings, installation of valves and pumps, concrete construction, supply of custom fittings and valves, excavation works.


Quanta Solar

Kennedy Energy Project Hughenden – construction of KEPG high voltage switchyard including all structural footings, construction of Jardine switch yard including all structural footings, construction of Cape River switch yard including all structural footings.


Downers Engineering

Construction of structural footings for switch yard equipment at George Fisher Mine, design and construction of operation and maintenance building at Clare Solar Farm.


George Fisher Mine

Construction of boiler maker work shop.


South 32

Various building and construction works at Yurbi – various mining infrastructure works.  


Cannington Mine

Construction of concrete spillways, associated pipe works, various concrete structures.


Huddy’s Mining Services

Yurbi Rail Loading Facility Cloncurry – polyethylene supply, poly installation, poly welding and fabrication, poly ductile and concrete stormwater, supply and installation of electrical conduits and pits, structural concrete works.


Monadelphous

Installation of tank footings and various concrete structures in Mount Isa.


Altona Mining

Earthworks, excavation, rehabilitation and exploratory works, regulated waste removal.


Cudeco Limited

Rocklands Mine - Construction of primary crusher circuit foundations, construction of seepage collection system, poly welding, cement linings to tailings dam, transformer slabs, labour hire, plant hire.


Rio Tinto

Various plant hire, labour hire, vacuum exaction works.


Central Hotel

Design and construction of Central Hotel Bottle Shop at the Central Hotel in Cloncurry.


Cloncurry Tyres and Batteries Shed

Design and construction of 1375m2, 11 bay she with cantilevered awning, construction of large offices, lunch room and show room.


Contact Auzscot Constructions today to arrange a quote.

|